Period: | October 1994 - January 1996 |
Contract: | San Pedro Water & Sewerage Project. Contract A. Reservoir. Sewerage Stabilization Ponds/Access Road |
Country: | Belize |
Employer: | Johnston Int'l Ltd. |
Employer's Address: | P.O. Box 70 Providenciales Turks & Caicos Island British West Indies Tel: 809-946-4279 |
A. Reservoir.
Construction of a .5 million gallons concrete water reservoir on a piled foundation.
Salient Points are:
-40 plus concrete piles (5,500 p.s.i.) were constructed, driven
and capped.
-622 cubic meters of 35 mpa concrete was poured.
-93 tonnes of rebar was bent and placed.
-318 square meters of 295 cm and 143 cm blocks placed
Contract Period – 9 months.
B. Sewerage Stabilization Pond/Access Road
1,400m long, 6m wide access road was constructed as an access road to construct a 30 acre sewerage pond. The road and ponds were constructed on reclaimed mangrove landusing locally available fill on the island.
Role: | Sole Contractor |
Total Value of Contract: | BZ $5,179,000.00 (US $2,589,500.00) |
Contract Awarded: | |
Period: | Completion Date: | January 1996. | Funding Agency: |
Description: